Wednesday, 7 September 2016
Saturday, 23 July 2016
Detail Drawing Final Project
In this last project, we were given a task to produce 7 set of drawing included setting out plan, furniture layout plan, reflected ceiling plan , electrical plan, section drawing, water supply system and 2 detailed drawings.
Thursday, 26 May 2016
Detailing &Working Drawings II - Exercise 6 ( Reflection on Project 2 )
26.05.2016
Thursday
Ong Tian Chun
0321331
During the class,we were given an assignment to produce report and 5 drawings .We were given 3 weeks to complete this given assignment and we had submitted this assignment yesterday.
We were divided into 4 group members(Low Pei Sye,Ng Hui Yee and Evelyn Leong) in a group and i am the leader of the group.I had assigned the task of typing report to Pei Sye and Evelyn,while me and Hui Yee draw the 7 drawings of this assignment.
We had faced some problems on typing the reports.So Hui Yee was asked to help the other two that type reports while i still focus on the drawings. Im disappointed of myself for having problems of time management and cause some of the drawings were not completed.Its all my fault for not being a responsible leader. Im really appreciate about the efforts given by my group members.
Thursday
Ong Tian Chun
0321331
During the class,we were given an assignment to produce report and 5 drawings .We were given 3 weeks to complete this given assignment and we had submitted this assignment yesterday.
We were divided into 4 group members(Low Pei Sye,Ng Hui Yee and Evelyn Leong) in a group and i am the leader of the group.I had assigned the task of typing report to Pei Sye and Evelyn,while me and Hui Yee draw the 7 drawings of this assignment.
We had faced some problems on typing the reports.So Hui Yee was asked to help the other two that type reports while i still focus on the drawings. Im disappointed of myself for having problems of time management and cause some of the drawings were not completed.Its all my fault for not being a responsible leader. Im really appreciate about the efforts given by my group members.
Wednesday, 20 April 2016
We are given a task from our lecturer to go for a site visit and explore different furniture and produce observation sketches of a table, chair and cabinet. The selected furniture must have different materials to ensure we could understand more on the joinery details and features. For my site visit, I went to IKEA at Daman Sara.
Coffee Table
Glass Door Cabinate
Tuesday, 12 April 2016
Three different furniture that our lecture give us to sketch. We have to sketch
the furniture with an extra sketch respectively (plan, section, detail
or 3D).
Specifications include, sizes and heights (L X W X H), material, methods
of joinery, installation, fastening and support systems and lastly,
finishes.
Tuesday, 5 April 2016
Wednesday, 23 December 2015
MEMORABILIA STORE ASSIGNMENT
In this assignment, we were required to come up with a design of a memorabilia store for our music genre combined with a design style that was given to us. For my project it is Classic Pop with the Eclectic style.
This is the presentation board and model that I have done for the assignment. The idea behind the design was based on the Roman Garden, coming from the Classic idea of the music genre and mixing it with the Eclectic style.
This is the presentation board and model that I have done for the assignment. The idea behind the design was based on the Roman Garden, coming from the Classic idea of the music genre and mixing it with the Eclectic style.
Subscribe to:
Posts (Atom)

























